House Set Part 2

Setting the second module.

Raising the roof on the second module. (In case you’re wondering, some of the shingles were put on in the factory. The big hole is for a shed dormer.)

See?

God’s beautiful sunset!

Here’s that same sunset reflected on the back of our house. I can’t believe I’m saying this, but I can’t wait to do dishes in this house. (The kitchen sink is under the two windows that are right next to each other.)

The crew working in the dark.

The next day. . . (Note, that most of the shingles are on and all the walls are up. The garage will come off of the mudroom extension in the left of the picture and the porch will wrap from the front corner in the right of the picture, around the corner, and to the door off the mudroom

The hole for the steps down into the basement. (It’s currently covered over with plastic.)

By the way, here is a picture of our second module almost in the creek.

~ Amy

House Delivery Part 2 & House Set Part 1

We officially have a house! Yay!!

The third truck came about 1415. By the time they unloaded the second module, 5 out the 12 wheels on the trailer had gone flat or blown out, 2 on the way up from the factory, 2 getting into the driveway, and 1 coming up the driveway. On top of that, when the truck crossed our creek it slid slightly off the driveway, putting a big whopping dent in one of our 2 culverts. They eventually did get across the creek but it took them upwards of 45 minutes.

The third truck coming up the road!

Getting ready to cross the creek.

While waiting for the second module to arrive, the work crew was far from idle!

They unwrapped the dormers, put moisture barrier paper on them and put the windows in.

Lowering the first module into place.

Making sure it was exactly square with the basement.

Raising the roof and putting the side walls in.

The first dormer is set!

Lowering in the second dormer.

The men and I watching as they secured the dormer. (left to right: Daniel, Josh, Me, and Daddy)

Putting on the next segment of roof.

Past the point of no return! Pulling the trailer out from under the second module.

Setting the second module.

I’ll post more pictures later!

~ Amy

Constructing the Basement

Digging the last of the basement

Leveling the ground with 6 inches of gravel for the walls to go in

The first load of pre-cast basment walls

Looking at the crane over the trees from the crest of the driveway

Several wall panels in place (The yellow pole is a brace)

Craning in the next panel

Hoisting!

Lowering into place

The last corner!

Easing it into place

Ta-da!

The walkout

looking toward the garage end

The first of four cement trucks

Pouring the slab

The completed slab, drying

Just in case you are wondering, the dirt is going to be filled in aound the basement. This is called backfill.

~ Amy