Before we put in our flooring, we wrote Bible verses on the subfloor. Some rooms had one, some had two, some even had three.

We wanted our home to be firmly founded on God’s Word, and this was a literal approach.

Starting with the girls room, here are the verses we used:

Girls’ doorway:

“. . .And may our daughters be like corner pillars, cut for the structure of a palace.”

Psalm 144:12b

Girls’ dormer:

“She opens her mouth with wisdom, and the teaching of kindness is on her tongue”

Proverbs 31:26

Girls’ bathroom:

“Likewise also that women should adorn themselves in respectable apparel with modesty and self-control. . .”

1 Timothy 2:9a

Boys’ doorway:

“May our sons in their youth be like plants full-grown. . .”

Psalm 144:12a

Boys’ room:

“For I know the plans I have for you declares the LORD. . .”

Jeremiah 29:11a

Boys’ dormer:

“Iron sharpens iron, and one man sharpens another.”

Proverbs 27:17

Boys’ bathroom:

“Turn my eyes away from worthless things; and give me life in Your ways.”

Psalm 119:37

Schoolroom doorway:

“Your faithfulness endures unto all generations; You have established it in the earth, and it stands fast.”

Psalm 119:90

Schoolroom:

“I will instruct you and teach you in the way you should go; I will counsel you with My eye upon you.”

Psalm 32:8

Main dormer:

“You are good and You do good; teach me Your statutes.”

Psalm 119:68

Front door: (also our Ranch’s verse)

“So he called it Rehoboth, saying,’For now the LORD has made room for us, and we will be fruitful in the land.'”

Genesis 26:22b

Piano space:

“Sing to Him a new song. . .”

Psalm 33:3a

Den:

“Chose this day whom you will serve. . .”

Joshua 24:15b

Dining room:

“These all look to You, [speaking of the LORD] to give them their food in due season. When You give it to them, they gather it up; when You open Your hand it is filled with good things.”

Psalm 104:27-28

Back door:

“Man goes out to his work and to his labor until the evening. O LORD, how manifold are Your works!”

Psalm 104 23-24a

Kitchen:

“Oh, taste and see that the LORD is good!”

Psalm 35:8a

~ Amy

Painting Part 1

The entire main floor of our home came from the factory primed for painting. We painted the entire main floor Antique Buff by Valspar, (a neutral beige), with a few exceptions.

  1. The kitchen was painted Butter by Olympic
  2. One wall in Mum and Daddy’s room was painted Yacht Harbor by Behr

Also, I just wanted to extend a huge thanks to all our friends who came to help with painting. It was an enormous blessing!

Our paint! (A total of 48 gallons)

The pod hallway. The first door at the end of the hall goes into the garage, the first doorway on the right is the bathroom, the second is the laundry room, and the third (not visible in this picture), is the pantry. The door on the left will open onto the front porch. Lockers will eventually be built by Josh and Daniel onto the left-hand wall.

The hallway after paint.

The hall-bath before paint.

The hall-bath after paint (The truest color in this picture is the narrow wall beside the shower)

The laundry room prior to painting. (The washer and dryer along with an upright freezer will go on the left wall and a bank of cabinets will eventually be built on the right wall for folding clothes/sewing. Also note that the boxes stacked up are the laminate flooring for the upstairs.)

The laundry room after painting.

A little woodpecker on a hickory tree near the house.

Remember, the big move is this Saturday!!

~ Amy

Water!

We hired a local drilling company to drill our water well and our HVAC wells. Overall, we were very happy with their work!

The drilling rig and pipe truck.

Drilling (The gray sludge is silt)

River of sludge (yuck!)

When he was done drilling the well he took the cap off causing the built up pressure to release creating a geyser.

The water pressure was amazing!

Sunshine!

Telephone poles and a lovely sunset on the way home

 

~ Amy

Drywall Part 2

After all the drywall went up we hired a mudder to finish the walls and get them ready for paint.

The boys’ room all mudded

Another view of the boys’ room (The silver pipe is the chimney pipe from our wood stove. There will be a drywalled box around it eventually.)

The boys’ bathroom drywalled and mudded (The drywall in the bathrooms was green because it is a water-resistant drywall.)

The main dormer all mudded

Another view

Getting ready to mud the girls’ room. (The black things in the window are the mudders stilts. He mudded around the top of each room first wearing his stilts to avoid the need for a ladder.)

The outside wall of the girls’ room

Another breathtaking sunset!

Each day I am awed by God’s majesty as displayed in a microcosm thru the phenomenal sunsets every evening!

(A panoramic view)

~ Amy

Drywall Part 1

Samuel helping Daddy crank up the first sheet of drywall.

S t r e t c h ! Daddy and Daniel putting the drywall up on the ceiling of the girls’ dormer.

The girls’ room ceiling, completely drywalled.

Another view of the ceiling in the girls’ room.

Daniel with the drywall lift. (Note the drywalled upper slope behind him.)

The ceiling of the schoolroom completely drywalled with the exception of the dormer.

Daniel cutting a hole for the can light in the main dormer.

Josh and Daniel screwing in a sheet on one of the front slopes of the schoolroom.

Josh and Daniel measuring for the next sheet of drywall.

Phenomenal sunset that evening!

To close with, here is a picture of our house as of 6 days ago:

~ Amy

Update

I’m sorry it’s been so long since my last post! All the house pictures have been on Josh’s phone and he’s been so busy with house stuff that he hasn’t had time to upload them onto the computer.

That being said, we’re almost done!! The entire main floor is painted except the for the kitchen, and the upstairs is completely drywalled and primed. Daddy has set the 24th of November as the move in date, ‘wether we’re ready or not’.

The things that have to be done before we move in are:

  1. The kitchen needs to be painted
  2. The hardwood floor needs to be laid down on the main level
  3. The pantry shelves need to be built
  4. Hanging rods need to be purchased/installed in all 4 clothes closets (Daddy’s, Mum’s, boy’s, and girl’s)
  5. The upstairs needs to be painted (including ceilings)
  6. Laminate flooring needs to be put down upstairs
  7. The upstairs bathrooms need to be tiled
  8. The upstairs toilets need to be purchased and installed
  9. The upstairs vanities/tops need to be purchased and/or built and installed
  10. And last but certainly not least, the stairs down into the basement need to be built

I know it seems impossible, but I am constantly reminded that, as Philippians 2:13 says,

“I can do all things through Christ who strengthens me.”

Please note that following this post will be a series of posts, (with pictures *smile*), that will hopefully bring you up to date.

Have a blessed day!

~ Amy

Framing the Upstairs

The past 2 weeks the boys have been working on framing the upstairs. (Where the kids bedrooms, bathrooms, and schoolroom will be.)

Here’s a diagram I drew of the upstairs. The black walls are walls that were on the house when we got it. The red walls are walls that the boys have framed. (Please note that the drawing is not to scale. Also, the proportions are a little off.)

The 2 bedrooms are on either side of the upper story. The boys’ is on the far left and the girls’ is on the far right. The schoolroom is in the front of the middle space and the two bathrooms are in the back of that same space. (The red wall in the back of each bedroom is the front wall of the closet. Also, the red box in the boys’ room is the 2 foot box around the chimney pipe of our wood stove. Oh, and the red wall just to the left of the girls’ bedroom wall is the wall beside the stairs.)

Abigail investigating the blueprint. (Laid out in the floor of the girls’ room.)

Josh, Daniel, and I checking the girls’ closet wall for level.

Josh and Daniel nailing in the last studs for the girls’ room wall

Josh hammering on the girls’ wall a little to make it level while I held a board up to prevent the sledgehammer from marring the studs.

Daniel cutting a notch out of a rafter to help the bedroom wall fit better,

Samuel stacking up scraps.

Daniel measuring studs for the end wall of the boys’ closet

Josh and Daniel assembling the last of the boys’ room wall.

Josh and Daniel raising the boys’ bedroom wall.

Josh, Daniel, and I measuring the boys’ room wall to estimate drywall and installation.

~ Amy

House Set Part 2

Setting the second module.

Raising the roof on the second module. (In case you’re wondering, some of the shingles were put on in the factory. The big hole is for a shed dormer.)

See?

God’s beautiful sunset!

Here’s that same sunset reflected on the back of our house. I can’t believe I’m saying this, but I can’t wait to do dishes in this house. (The kitchen sink is under the two windows that are right next to each other.)

The crew working in the dark.

The next day. . . (Note, that most of the shingles are on and all the walls are up. The garage will come off of the mudroom extension in the left of the picture and the porch will wrap from the front corner in the right of the picture, around the corner, and to the door off the mudroom

The hole for the steps down into the basement. (It’s currently covered over with plastic.)

By the way, here is a picture of our second module almost in the creek.

~ Amy

House Delivery Part 2 & House Set Part 1

We officially have a house! Yay!!

The third truck came about 1415. By the time they unloaded the second module, 5 out the 12 wheels on the trailer had gone flat or blown out, 2 on the way up from the factory, 2 getting into the driveway, and 1 coming up the driveway. On top of that, when the truck crossed our creek it slid slightly off the driveway, putting a big whopping dent in one of our 2 culverts. They eventually did get across the creek but it took them upwards of 45 minutes.

The third truck coming up the road!

Getting ready to cross the creek.

While waiting for the second module to arrive, the work crew was far from idle!

They unwrapped the dormers, put moisture barrier paper on them and put the windows in.

Lowering the first module into place.

Making sure it was exactly square with the basement.

Raising the roof and putting the side walls in.

The first dormer is set!

Lowering in the second dormer.

The men and I watching as they secured the dormer. (left to right: Daniel, Josh, Me, and Daddy)

Putting on the next segment of roof.

Past the point of no return! Pulling the trailer out from under the second module.

Setting the second module.

I’ll post more pictures later!

~ Amy

Sill Plate Installation

Our men spent Saturday installing the sill plate so as to be ready for the house set on Monday. A sill plate is basically boards that go between the top of the concrete walls of the basement and the bottom of the walls of the house. The sill plate serves two basic purposes, 1: It enables the house to be bolted down more easily. (It might be a little difficult to bolt it into solid concrete!) 2: To act as a moisture barrier to prevent water from seeping up the walls of the house.

Countersinking the bolt holes in a sill plate board so that the bolt heads do not stick out above the board.

Josh positioning the next board.

Josh drilling in a bolt while Daniel holds the board down.

Daddy is hammering the bolts thru the pre-drilled holes in the sill plate and the concrete wall.

Sill plate in progress (The pink roll is Sill Seal. It acts as a barrier between the concrete walls and the boards of the sill plate.)

Daniel traversing the wall.

Almost done!

Josh is drilling in a bolt while Daniel is keeping the nut from spinning.

The completed sill plate

Just remember, TOMORROW IS HOUSE SET DAY!!

~ Amy