We officially have a house! Yay!!
The third truck came about 1415. By the time they unloaded the second module, 5 out the 12 wheels on the trailer had gone flat or blown out, 2 on the way up from the factory, 2 getting into the driveway, and 1 coming up the driveway. On top of that, when the truck crossed our creek it slid slightly off the driveway, putting a big whopping dent in one of our 2 culverts. They eventually did get across the creek but it took them upwards of 45 minutes.
The third truck coming up the road!
Getting ready to cross the creek.
While waiting for the second module to arrive, the work crew was far from idle!
They unwrapped the dormers, put moisture barrier paper on them and put the windows in.
Lowering the first module into place.
Making sure it was exactly square with the basement.
Raising the roof and putting the side walls in.
The first dormer is set!
Lowering in the second dormer.
The men and I watching as they secured the dormer. (left to right: Daniel, Josh, Me, and Daddy)
Putting on the next segment of roof.
Past the point of no return! Pulling the trailer out from under the second module.
Setting the second module.
I’ll post more pictures later!
~ Amy