Constructing the Basement
Digging the last of the basement
Leveling the ground with 6 inches of gravel for the walls to go in
The first load of pre-cast basment walls
Looking at the crane over the trees from the crest of the driveway
Several wall panels in place (The yellow pole is a brace)
Craning in the next panel
Hoisting!
Lowering into place
The last corner!
Easing it into place
Ta-da!
The walkout
looking toward the garage end
The first of four cement trucks
Pouring the slab
The completed slab, drying
Just in case you are wondering, the dirt is going to be filled in aound the basement. This is called backfill.
~ Amy